Opening...
Opening...
Last checked: 1 day ago
Closing date: Wednesday, 14 October 2026
Country: Global
Duty station: Not specified
Contract type: Individual Consultant (Deliverable)
Grade: Individual Consultant 5
Applicant eligibility: Not explicit in source
Ad
Ad
Please note that the deadline is based on Korean Standard Time Zone (KST, UTC+9)
The Global Green Growth Institute (GGGI) is a treaty-based international, inter-governmental organization dedicated to supporting and promoting strong, inclusive and sustainable economic growth in developing countries and emerging economies. To learn more please visit about GGGI web page.
Papua New Guinea (PNG) is among the countries most vulnerable to the impacts of climate change. Its road network is a lifeline for economic growth, social connectivity and access to essential services, and it is increasingly compromised by intense rainfall, flooding, landslides and related hazards. The heavy rains of 2024 alone caused damages estimated at PGK 500 million (approximately USD 125 million).
With funding from the Australian Department of Foreign Affairs and Trade (DFAT), GGGI is implementing the Climate Finance Initiative for Resilience and a Sustainable Transition (Climate FIRST), developed under the PNG–Australia Climate Change Action Plan (PACCAP), in close collaboration with the Climate Change and Development Authority (CCDA).
Under Climate FIRST, GGGI is supporting the PNG Department of Works and Highways (DoWH) to prepare a climate-resilient road investment in Morobe Province (the Trans-National Highway 9 Mile to Bulolo Resilient Road Project) for potential financing by the Asian Infrastructure Investment Bank (AIIB). To make the best use of resources, the work concentrates on a selected first section of approximately 25-45 km, agreed in consultation with DoWH and AIIB, to be prepared to the required standard by December 2026 as a model for the rest of the corridor.
All deliverables under this assignment are intended for DoWH and AIIB. The governing technical and safeguard context is therefore the AIIB Environmental and Social Framework (ESF, June 2024), the AIIB Procurement Policy (as revised through June 26, 2024) read with the Directive on Procurement Instructions for Recipients (July 26, 2024), the DoWH Climate Change Risk and Vulnerability Assessment (CCRVA) Framework (May 2025) and its Guidelines, and the DoWH Climate-Responsive Manuals 1–5 (Design; Construction; Maintenance; Operations; Rehabilitation and Decommissioning). GGGI procurement and contracting processes follow GGGI rules and templates.
A central mandate of this work is capacity building: GGGI teams work alongside DoWH, Conservation and Environment Protection Authority, CCDA and the PNG National Weather Service (PNGNWS), so that lasting technical capability remains within PNG institutions after the project ends.
GGGI seeks to engage a competent consultant (hereinafter referred to as the “Consultant/Service Provider”) to undertake an ex-ante greenhouse gas (GHG) assessment of the selected road section of the Trans-National Highway 9 Mile -Bulolo Resilient Road Project. The assignment will quantify the project’s gross and relative GHG emissions in accordance with the methodology agreed with AIIB and provide transparent, traceable, and reproducible results for AIIB project appraisal. Building on the GHG assessment results, the assignment also includes a pre-feasibility assessment of the project’s potential to access carbon market finance (Task 4).
The GHG assessment (Tasks 1–3) is expected to be completed within 1 month (30 calendar days) from the time of contract signing, tentatively during November 2026, including review and necessary revisions, subject to timely availability of the required traffic, design, cost, and construction quantity inputs. The carbon market pre-feasibility assessment (Task 4) shall be completed within 90 calendar days of contract signing, within the overall contract duration.
The methodological basis shall apply the IFI Harmonized Framework and the IFI Joint Approach for the Transport Sector, supplemented by the AIIB GHG Accounting Guidance for Investment Projects. The assessment period shall cover the construction period plus 20 years of operation.
Scope of Work
Task 1 – Methodology, scenarios, and assessment boundary
Task 2 – Ex-ante GHG emissions calculations
Task 3 – Results, reporting, and AIIB coordination
Task 4 – Pre-feasibility assessment for Carbon Market trading
OUTPUT / DELIVERABLE
SCOPE OF DELIVERABLES
PERCENTAGE
OF MAXIMUM AMOUNT
DUE DATE
1. Inception and GHG Assessment Methodology Report
Methodology note; baseline and with-project scenarios; assessment boundary and key assumptions; proposed treatment of Scope 1, Scope 2, Scope 3 and relevant upstream/downstream emissions; relevant sections of the AIIB GHG assessment summary template; anticipated data gaps and workplan.
15%
15 calendar days from contract signing
2. Final GHG Assessment Report and Model (Task 1,2, and 3)
Final ex-ante GHG assessment covering gross, baseline and relative emissions; completed AIIB GHG assessment summary template; transparent and reproducible Excel calculation model; key assumptions, emission factors, data sources and uncertainties; and identification of material mitigation opportunities for further assessment under the carbon-credit pre-feasibility study
30%
30 calendar days from contract signing
3. Carbon Credit Pre-FS Package and Report (Task 4)
Assessment of applicable PNG carbon-market requirements; comparison of relevant carbon-crediting programs, methodologies and project structures; recommended crediting pathway and methodology; preliminary assessment of additionality, MRV readiness, crediting potential and commercial viability; key technical, regulatory, methodological and commercial gaps; and an indicative roadmap, timeline and cost range for progressing toward validation, registration, monitoring, verification and issuance.
55%
90 calendar days from contract signing
All reports and outputs must be in English, in accordance with GGGI’s formatting requirements, and submitted in hard copy, electronic, and editable MS Word and Excel formats (as applicable) along with complete sets of raw data, research materials, and interview notes.
Reporting Arrangements
Suggested Methodology
The Consultant/Service Provider shall describe in its proposal its proposed approach to undertaking the ex-ante GHG assessment, including application of the agreed methodological basis, definition of the baseline (without-project) and with-project scenarios and assessment boundaries, treatment of relevant construction, operational and maintenance emissions, and preparation of transparent and reproducible calculations.
The Consultant/Service Provider shall also describe its general approach to completing the assessment and review process within the required timeline, including proposed data requirements, emission-factor selection, quality-assurance arrangements, and coordination plan with the economic analysis and other project preparation workstreams. The proposal shall also outline the proposed approach to the carbon market pre-feasibility assessment (Task 4), including the crediting programs and methodologies to be screened and the approach to assessing additionality and commercial viability.
Competence Requirements and Allocation
Functional
Corporate
Date to close is Korean Standard Time (KST). Applications submitted after the deadline will not be considered. Application, Cover Letter, and CV must be sent in English. A consortium, or a firm may not be engaged for the individual consultant assignment.
Child protection – GGGI is committed to child protection, irrespective of whether any specific area of work involves direct contact with children. GGGI’s Child Protection Policy is written in accordance with the Convention on the Rights of the Child.
Ad
Ad